The South Pole - Part 30
Library

Part 30

We made very poor progress to begin with, as we had calms for nearly three weeks, in spite of its being the month of March in the west wind belt of the South Pacific. On the morning of Easter Sunday, April 7, the wind first freshened from the north-west and blew day after day, a stiff breeze and a gale alternately, so that we went splendidly all the way to the Falkland Islands, in spite of the fact that the topsail was reefed for nearly five weeks on account of the fragile state of the yard. I believe most of us wanted to get on fast; the trip was now over for the present, and those who had families at home naturally wanted to be with them as soon as they could; perhaps that was why we went so well.

On April 1 Mrs. Snuppesen gave birth to eight pups; four of these were killed, while the rest, two of each s.e.x, were allowed to live.

On Maundy Thursday, April 4, we were in long. 180 and changed the date, so that we had two Maundy Thursdays in one week; this gave us a good many holidays running, and I cannot say the effect is altogether cheerful; it was a good thing when Easter Tuesday came round as an ordinary week-day.

On May 6 we pa.s.sed Cape Horn in very fair weather; it is true we, had a snow-squall of hurricane violence, but it did not last much more than half an hour. For a few days the temperature was a little below freezing-point, but it rose rapidly as soon as we were out in the Atlantic.

From Hobart to Cape Horn we saw no ice.

After pa.s.sing the Falkland Islands we had a head wind, so that the last part of the trip was nothing to boast of.

On the night of May 21 we pa.s.sed Montevideo, where the Chief had arrived a few hours before. From here up the River La Plata we went so slowly on account of head wind that we did not anchor in the roads of Buenos Aires till the afternoon of the 23rd, almost exactly at the same time as the Chief landed at Buenos Aires. When I went ash.o.r.e next morning and met Mr. P. Christophersen, he was in great good-humour. "This is just like a fairy tale," he said; and it could not be denied that it was an amusing coincidence. The Chief, of course, was equally pleased.

On the 25th, the Argentine National Fete, the Fram was moored at the same quay that we had left on October 5, 1911. At our departure there were exactly seven people on board to say good-bye, but, as far as I could see, there were more than this when we arrived; and I was able to make out, from newspapers and other sources, that in the course of a couple of months the third Fram Expedition had grown considerably in popularity.

In conclusion I will give one or two data. Since the Fram left Christiania on June 7, 1910, we have been two and a half times round the globe; the distance covered is about 54,400 nautical miles; the lowest reading of the barometer during this time was 27.56 inches (700 millimetres) in March, 1911, in the South Pacific, and the highest 30.82 inches (783 millimetres) in October, 1911, in the South Atlantic.

On June 7, 1912, the second anniversary of our leaving Christiania, all the members of the Expedition, except the Chief and myself, left for Norway, and the first half of the Expedition was thus brought to a fortunate conclusion.

CHAPTER I

The "Fram"

By Commodore Christian Blom

Colin Archer says in his description of the Fram, in Fridtjof Nansen's account of the Norwegian Arctic Expedition, 1893 -- 1896, that the successful result of an expedition such as that planned and carried out by Dr. Nansen in the years 1893 -- 1896 must depend on the care with which all possible contingencies are foreseen, and precautions taken to meet them, and the choice of every detail of the equipment with special regard to the use to which it will be put. To no part of the equipment, he says, could this apply with greater force than to the ship which was to carry Dr. Nansen and his companions on their adventurous voyage.

Colin Archer then built the ship -- Fram was her name -- and she showed -- first on Fridtjof Nansen's famous voyage, and afterwards on Sverdrup's long wintering expedition in Ellesmere Land, that she answered her purpose completely, nay, she greatly exceeded the boldest expectations.

Then Roald Amundsen decided to set out on a voyage not less adventurous than the two former, and he looked about for a suitable ship. It was natural that he should think of the Fram, but she was old -- about sixteen years -- and had been exposed to many a hard buffet; it was said that she was a good deal damaged by decay.

Roald Amundsen, however, did not allow himself to be discouraged by these misgivings, but wished to see for himself what kind of a craft the Fram was after her two commissions. He therefore came down to Horten with Colin Archer on June 1, 1908, and made a thorough examination of the vessel. He then, in the spring of 1909, requested the Naval Dockyard at Horten to repair the ship and carry out the alterations he considered necessary for his enterprise.

Before giving an account of the repairs and alterations to the vessel in 1909 -- 1910, we shall briefly recapitulate, with the author's permission, a part of the description of the Fram in Fridtjof Nansen's work, especially as regards the constructive peculiarities of the vessel.

The problem which it was sought to solve in the construction of the Fram was that of providing a ship which could survive the crushing embrace of the Arctic drift-ice. To fit her for this was the object before which all other considerations had to give way.

But apart from the question of mere strength of construction, there were problems of design and model which, it was thought, would play an important part in the attainment of the chief object. It is sometimes prudent in an encounter to avoid the full force of a blow instead of resisting it, even if it could be met without damage; and there was reason to think that by a judicious choice of model something might be done to break the force of the ice-pressure, and thus lessen its danger. Examples of this had been seen in small Norwegian vessels that had been caught in the ice near Spitzbergen and Novaya Zemlya. It often happens that they are lifted right out of the water by the pressure of the ice without sustaining serious damage; and these vessels are not particularly strong, but have, like most small sailing-ships, a considerable dead rising and sloping sides. The ice encounters these sloping sides and presses in under the bilge on both sides, until the ice-edges meet under the keel, and the ship is raised up into the bed that is formed by the ice itself.

In order to turn this principle to account, it was decided to depart entirely from the usual flat-bottomed frame-section, and to adopt a form that would offer no vulnerable point on the ship's side, but would cause the increasing horizontal pressure of the ice to effect a raising of the ship, as described above. In the construction of the Fram it was sought to solve this problem by avoiding plane or concave surfaces, thus giving the vessel as far as possible round and full lines. Besides increasing the power of resistance to external pressure, this form has the advantage of making it easy for the ice to glide along the bottom in any direction.

The Fram was a three-masted fore-and-aft schooner with an auxiliary engine of 200 indicated horse-power, which was calculated to give her a speed of 6 knots, when moderately loaded, with a coal consumption of 2.8 tons a day.

The vessel was designed to be only large enough to carry the necessary coal-supply, provisions, and other equipment for a period of five years, and to give room for the crew.

Her princ.i.p.al dimensions are:

Length of keel 103.3 English feet Length of waterline 119'

Length over all 128'

Beam on waterline 34'

Greatest beam 36'

Depth 17.2'

Her displacement, with a draught of 15.6 feet, is 800 tons. The measurements are taken to the outside of the planks, but do not include the ice-skin. By Custom-house measurement she was found to be 402 gross tons register, and 807 tons net.

The ship, with engines and boilers, was calculated to weigh about 420 tons. With the draught above mentioned, which gives a freeboard of 3 feet, there would thus be 380 tons available for cargo. This weight was actually exceeded by 100 tons, which left a freeboard of only 20 inches when the ship sailed on her first voyage. This additional immersion could only have awkward effects when the ship came into the ice, as its effect would then be to r.e.t.a.r.d the lifting by the ice, on which the safety of the ship was believed to depend in a great measure. Not only was there a greater weight to lift, but there was a considerably greater danger of the walls of ice, that would pile themselves against the ship's sides, falling over the bulwarks and covering the deck before the ice began to raise her. The load would, however, be lightened by the time the ship was frozen fast. Events showed that she was readily lifted when the ice-pressure set in, and that the danger of injury from falling blocks of ice was less than had been expected. The Fram's keel is of American elm in two lengths, 14 inches square; the room and s.p.a.ce is 2 feet. The frame-timbers are almost all of oak obtained from the Naval Dockyard at Horten, where they had lain for many years, thus being perfectly seasoned. The timbers were all grown to shape. The frames consist of two tiers of timbers everywhere, each timber measuring 10 to 11 inches fore and aft; the two tiers of timbers are fitted together and bolted, so that they form a solid and compact whole. The joints of the frame-timbers are covered with iron plates. The lining consists of pitch-pine in good lengths and of varying thickness from 4 to 6 inches. The keelson is also of pitch-pine, in two layers, one above the other; each layer 15 inches square from the stem to the engine-room. Under the boiler and engine there was only room for one keelson. There are two decks. The beams of the main-deck are of American or German oak, those of the lower deck and half-deck of pitch-pine and Norwegian fir. All the deck planks are of Norwegian fir, 4 inches in the main-deck and 3 inches elsewhere. The beams are fastened to the ship's sides by knees of Norwegian spruce, of which about 450 were used. Wooden knees were, as a rule, preferred to iron ones, as they are more elastic. A good many iron knees were used, however, where wood was less suitable. In the boiler and engine room the beams of the lower deck had to be raised about 3 feet to give sufficient height for the engines. The upper deck was similarly raised from the stern-post to the mainmast, forming a half-deck, under which the cabins were placed. On this half-deck, immediately forward of the funnel, a deck-house was placed, arranged as a chart-house, from which two companions (one on each side) led down to the cabins. Besides the ice-skin, there is a double layer of outside planking of oak. The two first strakes (garboard strakes), however, are single, 7 inches thick, and are bolted both to the keel and to the frame-timbers. The first (inner) layer of planks is 8 inches thick, and is only fastened with nails; outside this comes a layer of 4-inch planks, fastened with oak trenails and through bolts, as usual. The two top strakes are single again, and 6 inches thick. The ice-skin is of greenheart, and covers the whole ship's side from the keel to 18 inches from the sheer strake. It is only fastened with nails and jagged bolts. Each layer of planks was caulked and pitched before the next one was laid. Thus only about 3 or 4 inches of the keel projects below the planking, and this part of the keel is rounded off so as not to hinder the ice from pa.s.sing under the ship's bottom. The intervals between the timbers were filled with a mixture of coal-tar, pitch, and sawdust, heated together and put in warm. The ship's side thus forms a compact ma.s.s varying in thickness from 28 to 32 inches. As a consequence of all the intervals between the timbers being filled up, there is no room for bilge-water under the lining. A loose bottom was therefore laid a few inches above the lining on each side of the keelson. In order to strengthen the ship's sides still more, and especially to prevent stretching, iron braces were placed on the lining, running from the clamps of the top deck down to well past the floor-timbers.

The stem consists of three ma.s.sive oak beams, one inside the other, forming together 4 feet of solid oak fore and aft, with a breadth of 15 inches. The three external plankings as well as the lining are all rabbeted into the stem. The propeller-post is in two thicknesses, placed side by side, and measures 26 inches athwart-ship and 14 inches fore and aft. It will be seen from the plan that the overhang aft runs out into a point, and that there is thus no transom. To each side of the stern-post is fitted a stout stern-timber parallel to the longitudinal midship section, forming, so to speak, a double stern-post, and the s.p.a.ce between them forms a well, which goes right up through the top deck. The rudder-post is placed in the middle of this well, and divides it into two parts, one for the propeller and one for the rudder. In this way it is possible to lift both the rudder and the screw out of the water. The rudder is so hung that the rudder-stock, which is cylindrical, turns on its own axis, to prevent the rudder being jammed if the well should be filled with ice. Aft of the rudder-well the s.p.a.ce between the stern-timbers is filled with solid wood, and the whole is securely bolted together with bolts running athwart-ship. The frame-timbers join the stern-timbers in this part, and are fastened to them by means of knees. The stem and stern-post are connected to the keelson and to the keel by stout knees of timber, and both the ship's sides are bound together with solid breasthooks and crutches of wood or iron.

Although the Fram was not specially built for ramming, it was probable that now and then she would be obliged to force her way through the ice. Her bow and stern were therefore shod in the usual way. On the forward side of the stem a segment-shaped iron was bolted from the bobstay-bolt to some way under the keel. Outside this iron plates (3 x 3/4 inches) were fastened over the stem, and for 6 feet on each side of it. These iron plates were placed close together, and thus formed a continuous armour-plating to a couple of feet from the keel. The sharp edge of the stern was protected in the same way, and the lower sides of the well were lined with thick iron plates. The rudder-post, which owing to its exposed position may be said to form the Achilles'

heel of the ship, was strengthened with three heavy pieces of iron, one in the opening for the screw and one on each side of the two posts and the keel, and bolted together with bolts running athwart-ship.

Extraordinary precautions were taken for strengthening the ship's sides, which were particularly exposed to destruction by ice-pressure, and which, on account of their form, compose the weakest part of the hull. These precautions will best be seen in the sections (Figs. 3 and 4). Under each beam in both decks were placed diagonal stays of fir (6 x 10 inches), almost at right angles to the ship's sides, and securely fastened to the sides and to the beams by wooden knees. There are 68 of these stays distributed over the ship. In addition, there are under the beams three rows of vertical stanchions between decks, and one row in the lower hold from the keelson. These are connected to the keelson, to the beams, and to each other by iron bands. The whole of the ship's interior is thus filled with a network of braces and stays, arranged in such a way as to transfer and distribute the pressure from without, and give rigidity to the whole construction. In the engine and boiler room it was necessary to modify the arrangement of stays, so as to give room for the engines and boiler. All the iron, with the exception of the heaviest forgings, is galvanized.

When Otto Sverdrup was to use the Fram for his Polar expedition, he had a number of alterations carried out. The most important of these consisted in laying a new deck in the fore part of the ship, from the bulkhead forward of the engine-room to the stem, at a height of 7 feet 4 inches (to the upper side of the planks) above the old fore-deck. The s.p.a.ce below the new deck was fitted as a fore-cabin, with a number of state-rooms leading out of it, a large workroom, etc. The old chart-house immediately forward of the funnel was removed, and in its place a large water-tank was fitted. The foremast was raised and stepped in the lower deck. A false keel, 10 inches deep and 12 inches broad, was placed below the keel. A number of minor alterations were also carried out.

After the Fram returned in 1902 from her second expedition under Captain Sverdrup, she was sent down to Horten to be laid up in the Naval Dockyard.

Not long after the vessel had arrived at the dockyard, Captain Sverdrup proposed various repairs and alterations. The repairs were carried out in part, but the alterations were postponed pending a decision as to the future employment of the vessel.

The Fram then lay idle in the naval harbour until 1905, when she was used by the marine artillery as a floating magazine. In the same year a good deal of the vessel's outfit (amongst other things all her sails and most of her rigging) was lost in a fire in one of the naval storehouses, where these things were stored.

In 1903 the ship's keel and stem (which are of elm and oak) were sheathed with zinc, while the outer sheathing (ice-skin), which is of greenheart, was kept coated with coal-tar and copper composition. In 1907 the whole outer sheathing below the water-line was covered with zinc; this was removed in 1910 when the ship was prepared for her third commission under Roald Amundsen.

In 1907 a thorough examination of the vessel was made, as it was suspected that the timber inside the thick cork insulation that surrounded the cabins had begun to decay.

On previous expeditions the cabins, provision hold aft, and workrooms forward of the fore-cabin, had been insulated with several thicknesses of wooden panelling. The interstices were filled with finely-divided cork, alternately with reindeer hair and thick felt and linoleum. In the course of years damp had penetrated into the non-conducting material, with the result that fungus and decay had spread in the surrounding woodwork. Thus it was seen during the examination in 1907 that the panelling and ceiling of the cabins in question were to a great extent rotten or attacked by fungus. In the same way the under side of the upper deck over these cabins was partly attacked by fungus, as were its beams, knees, and carlings. The lower deck, on the other hand, was better preserved. The filling-in timbers of spruce or fir between the frame-timbers in the cabins were damaged by fungus, while the frame-timbers themselves, which were of oak, were good. The outer lining outside the insulated parts was also somewhat damaged by fungus.

In the coal-bunkers over the main-deck the spruce knees were partly rotten, as were some of the beams, while the lining was here fairly good.

The masts and main-topmast were somewhat attacked by decay, while the rest of the spars were good.

During and after the examination all the panelling and insulation was removed, the parts attacked by fungus or decay were also removed, and the woodwork coated with carbolineum or tar. The masts and various stores and fittings were taken ash.o.r.e at the same time.

It was found that the rest of the vessel-that is, the whole of the lower part of the hull right up to the cabin deck-was perfectly sound, and as good as new. Nor was there any sign of strain anywhere. It is difficult to imagine any better proof of the excellence of the vessel's construction; after two protracted expeditions to the most northern regions to which any ship has ever penetrated, where the vessel was often exposed to the severest ice-pressure, and in spite of her being (in 1907) fifteen years old, the examination showed that her actual hull, the part of the ship that has to resist the heavy strain of water and ice, was in just as good condition as when she was new.

The vessel was then left in this state until, as already mentioned, Roald Amundsen and her builder, Colin Archer, came down to the dockyard on June 1, 1908, and with the necessary a.s.sistance made an examination of her.

After some correspondence and verbal conferences between Roald Amundsen and the dockyard, the latter, on March 9, 1909, made a tender for the repairs and alterations to the Fram. The repairs consisted of making good the damage to the topsides referred to above.

The alterations were due in the first instance to the circ.u.mstance that the steam-engine and boiler (the latter had had its flues burnt out on Sverdrup's expedition) were to be replaced by an oil-motor; as a consequence of this the coal-bunkers would disappear, while, on the other hand, a large number of oil-tanks, capable of containing about 90 tons of oil, were to be put in. It was also considered desirable to rig square-sails on the foremast in view of the great distances that were to be sailed on the proposed expedition.