Simple Sabotage Field Manual - Part 2
Library

Part 2

(7) Sprinkle carbon, graphite or metal dust on slip-rings so that the current will leak or short circuits will occur. When a motor is idle, nick the slip-rings with a chisel.

(8) Cause motor stoppage or inefficiency by applying dust mixed with grease to the face of the armature so that it will not make proper contact.

(9) To overheat electric motors, mix sand with heavy grease and smear it between the stator and rotor, or wedge thin metal pieces between them. To prevent the efficient generation of current, put floor sweepings, oil, tar, or paint between them.

(10) In motors using three-phase current, deeply nick one of the lead-in wires with a knife or file when the machine is at rest, or replace one of the three fuses with a blown-out fuse. In the first case, the motor will stop after running awhile, and in the second, it will not start.

(f) Transformers

(1) Transformers of the oil-filled type can be put out of commission if you pour water, salt into the oil tank.

(2) In air-cooled transformers, block the ventilation by piling debris around the transformer.

(3) In all types of transformers, throw carbon, graphite or metal dust over the outside bushings and other exposed electrical parts.

(g) Turbines for the most part are heavily built, stoutly housed, and difficult of access. Their vulnerability to simple sabotage is very low.

(1) After inspecting or repairing a hydro turbine, fasten the cover insecurely so that it will blow off and flood the plant with water. A loose cover on a steam turbine will cause it to leak and slow down.

(2) In water turbines, insert a large piece of sc.r.a.p iron in the head of the penstock, just beyond the screening, so that water will carry the damaging material down to the plant equipment.

(3) When the steam line to a turbine is opened for repair, put pieces of sc.r.a.p iron into it, to be blasted into the turbine machinery when steam is up again.

(4) Create a leak in the line feeding oil to the turbine, so that oil will fall on the hot steam pipe and cause a fire.

(h) Boilers

(1) Reduce the efficiency of steam boilers any way you can. Put too much water in them to make them slow-starting, or keep the fire under them low to keep them inefficient. Let them dry and turn the fire up; they will crack and be ruined. An especially good trick is to keep putting limestone or water containing lime in the boiler; it will deposit lime on the bottom and sides. This deposit will provide very good insulation against heat; after enough of it has collected, the boiler will be completely worthless.

(3) Production. Metals

(a) Iron and Steel

(1) Keep blast furnaces in a condition where they must be frequently shut down for repair. In making fire-proof bricks for the inner lining of blast furnaces, put in an extra proportion of tar so that they will wear out quickly and necessitate constant re-lining.

(2) Make cores for casting so that they are filled with air bubbles and an imperfect cast results.

(3) See that the core in a mold is not properly supported, so that the core gives way or the casting is spoiled because of the incorrect position of the core.

(4) In tempering steel or iron, apply too much heat, so that the resulting bars and ingots are of poor quality.

(b) Other Metals

No suggestions available.

(4) Production: Mining and Mineral Extraction

(a) Coal

(1) A slight blow against your Davy oil lamp will extinguish it, and to light it again you will have to find a place where there is no fire damp. Take a long time looking for the place.

(2) Blacksmiths who make pneumatic picks should not harden them properly, so that they will quickly grow dull.

(3) You can easily put your pneumatic pick out of order. Pour a small amount of water through the oil lever and your pick will stop working.

Coal dust and improper lubrication will also put it out of order.

(4) Weaken the chain that pulls the bucket conveyers carrying coal. A deep dent in the chain made with blows of a pick or shovel will cause it to part under normal strain. Once a chain breaks, normally or otherwise take your time about reporting the damage; be slow about taking the chain up for repairs and bringing it back down after repairs.

(5) Derail mine cars by putting obstructions on the rails and in switch points. If possible, pick a gallery where coal cars have to pa.s.s each other, so that traffic will be snarled up.

(6) Send up quant.i.ties of rock and other useless material with the coal.

(5) Production: Agriculture

(a) Machinery

(1) See par. 5 b. (2) (c), (d), (e).

(b) Crops and livestock probably will be destroyed only in areas where there are large food surpluses or where the enemy (regime) is known to be requisitioning food.

(1.) Feed crops to livestock. Let crops harvest too early or too late.

Spoil stores of grain, fruit and vegetables by soaking them in water so that they will rot. Spoil fruit and vegetables by leaving them in the sun.

(6) Transportation: Railways

(a) Pa.s.sengers

(1.) Make train travel as inconvenient as possible for enemy personnel.

Make mistakes in issuing train tickets, leaving portions of the journey uncovered by the ticket book; issue two tickets for the same seat in the train, so that an interesting argument will result; near train time, instead of issuing printed tickets write them out slowly by hand, prolonging the process until the train is nearly ready to leave or has left the station. On station bulletin boards announcing train arrivals and departures, see that false and misleading information is given about trains bound for enemy destinations.

(2) In trains bound for enemy destinations, attendants should make life as uncomfortable as possible for pa.s.sengers. See that the food is especially bad, take up tickets after midnight, call all station stops very loudly during the night, handle baggage as noisily as possible during the night, and so on.

(3) See that the luggage of enemy personnel is mislaid or unloaded at the wrong stations.

Switch address labels on enemy baggage.

(4) Engineers should see that trains run slow or make unscheduled stops for plausible reasons.

(b) Switches, Signals and Routing

(1) Exchange wires in switchboards containing signals and switches, so that they connect to the wrong terminals.

(2) Loosen push-rods so that signal arms do not work; break signal lights; exchange the colored lenses on red and green lights.

(3) Spread and spike switch points in the track so that they will not move, or place rocks or close-packed dirt between the switch points.

(4) Sprinkle rock salt or ordinary salt profusely over the electrical connections of switch points and on the ground nearby. When it rains, the switch will be short-circuited.

(5) See that cars are put on the wrong trains. Remove the labels from cars needing repair and put them on cars in good order. Leave couplings between cars as loose as possible.